Skip to content

Best pneumatic conveying systems for pharmaceutical powders

stock photo

Pneumatic pharma transport systems — definition: The best pneumatic transport systems for pharmaceutical powders combine OEB 4–5 containment with GMP Annex 1 (2022) compliance and sub-µg/m³ exposure levels. HECHT LBK-EC and LAS-EC systems are used by 60+ pharma companies across Europe for APIs, intermediates and highly potent excipients, with SMEPAC validation.

Key points

  • LBK-EC pneumatic (dense phase): OEB 5 containment, 0.5–10 tons/hour, GMP Annex 1 (2022)
  • LAS-EC vacuum: OEB 4–5, 50–2,000 kg/hour, ideal for batch pharma under 500 kg
  • Product-contact components in 316L or Hastelloy with FDA 21 CFR / USP Class VI
  • SMEPAC reports via the Test & Trial Centre in Pörnbach — third-party verification
  • 21 CFR Part 11 audit-trail compatible for IQ/OQ/PQ documentation

The best pneumatic pharma route depends on the OEB requirement, batch size and regulatory pathway. Test directly with your own powder at our Test & Trial Centre in Pörnbach, see the complete powder processing portfolio, or explore our pharma cases.

The best pneumatic transport systems for pharmaceutical powders combine efficiency with safety. For example: the ProClean Conveyor system complies with OEB 5, which applies an OEL of <1 µg/m3 and meets GMP standards.

FAQ — Best pneumatic transport systems for pharmaceutical powders

Which pneumatic conveyor suits OEB 5 pharma APIs?

For OEB 5 (1 µg/m³ 8h-TWA), HECHT LBK-EC with split-butterfly containment coupling is the standard. SMEPAC validation at the Test & Trial Centre shows 0.5–1 µg/m³ exposure during transfer. For batches <500 kg, LAS-EC vacuum with endless liner SBK is a more efficient route. Both systems deliver GMP Annex 1 (2022)-compliant documentation.

Which certificates does HECHT hold for pharma transport systems?

HECHT supplies with every pharma installation: 3.1 material certificates (EN 10204) for 316L/Hastelloy, FDA 21 CFR compliance for product-contact elastomers, USP Class VI biocompatibility, ATEX 2014/34/EU per zone (20/21/22), GMP Annex 1 (2022) gap assessment, IQ/OQ/PQ protocols (ISPE GAMP 5), and a SMEPAC measurement report for OEB 4+ exposure level.

How long does implementation of a pneumatic pharma transport system take?

Standard implementation runs 14–22 weeks: spec + SMEPAC test (2 wk), engineering + URS (4 wk), manufacturing (8–12 wk), site installation + IQ/OQ (2 wk), validation + PQ + training (2 wk). The HECHT Test & Trial Centre shortens this by 4–6 weeks through pre-validation of the containment route.

Author: Joost van Velzen, Managing Director Hecht Technology B.V.

Read also

Our products

Uw optimale websitegebruik
Deze website gebruikt cookies en integreert externe media. Door op “✓ Alles accepteren” te klikken, kiest u voor een optimale webervaring en stemt u in met de weergave van externe content. U kunt meer informatie vinden en uw persoonlijke voorkeuren instellen onder “Instellingen”. Meer informatie vindt u in ons Privacybeleid.

Gedetailleerde informatie over het gebruik van cookies en externe media.
Externe media omvatten video's of iframes van andere platforms die op deze website zijn ingesloten. Deze cookies bevatten geanonimiseerde informatie over uw bezoek aan deze website, wat uw gebruikerservaring verbetert. Om de website optimaal te laten functioneren, moet u actief instemmen met het gebruik van deze cookies. U kunt uw persoonlijke instellingen hier configureren. Heeft u nog vragen? Lees meer over uw rechten als gebruiker in het Privacybeleid en de Juridische disclaimer!
Je cookie-instellingen zijn opgeslagen.